Colorado Construction Stormwater Requirements Download the Colorado Construction Stormwater Inspection Form. The Colorado CGP is dated 1 April 2019 and is administered by the Colorado Department of Public Health & Environment (CDPHE). Permit Requirements: Construction NOI (Notice of Intent) Permits can be filed online through the Colorado Environmental Online System (CEOS). An NOI Permit is required […]
Month: March 2020
Stormwater Compliance and Electronic Signature Law Electronic Signatures Make Fully Digital Stormwater Compliance a Reality. For starters, let’s take a quick look at some of the places where a signature and a certification are required for stormwater compliance. The NOI PermitRight from the start of a project or facility, the owner or operator has to
Stormwater Compliance and Electronic Signature Law | ComplianceGORead More »
Alabama Construction Stormwater Requirements Download the Alabama Construction Stormwater Inspection Form. The Alabama Construction General Permit (CGP) is dated 1 April 2016. There are 7 CGP areas designated by the Alabama Department of Environmental Management (ADEM), each with a designated contact person. Here is a map of the CGP areas and contacts. Permit Requirements: Construction
Alabama Construction Stormwater Requirements | ComplianceGORead More »