Georgia Construction Stormwater Permits Georgia has 3 separate Construction Stormwater Permits, all dated May 2018. Permit Requirements: Stand Alone Construction Projects – Infrastructure Construction Projects – Common Plan of Development Construction Projects – Filing the NOI Permit: The process for filing the NOI permit is complicated, but the Georgia Environmental Protection Department (EPD) has created

Georgia Construction Stormwater Permits | ComplianceGORead More »

Florida Construction Stormwater Requirements The Florida Construction Generic Permit is dated February 2015. Permit Requirements: Plan Requirements: Construction Start Requirements: Inspector Requirements: Inspection Requirements: Signature Requirements: Stabilization and Termination: This is a quick summary of the Construction Stormwater requirements in Florida. To be sure you are meeting ALL the requirements and to lower your risk

Florida Construction Stormwater Requirements | ComplianceGORead More »

Colorado Construction Stormwater Requirements Download the Colorado Construction Stormwater Inspection Form. The Colorado CGP is dated 1 April 2019 and is administered by the Colorado Department of Public Health & Environment (CDPHE). Permit Requirements: Construction NOI (Notice of Intent) Permits can be filed online through the Colorado Environmental Online System (CEOS). An NOI Permit is required

Colorado Construction Stormwater Requirements | ComplianceGORead More »

Alabama Construction Stormwater Requirements Download the Alabama Construction Stormwater Inspection Form. The Alabama Construction General Permit (CGP) is dated 1 April 2016. There are 7 CGP areas designated by the Alabama Department of Environmental Management (ADEM), each with a designated contact person. Here is a map of the CGP areas and contacts. Permit Requirements: Construction

Alabama Construction Stormwater Requirements | ComplianceGORead More »